Tunnel construction
Krakbau Spółka Akcyjna specialises in the boring of transport (road and rail) tunnels using mining methods (shooting and mechanical techniques). Construction projects carried out by Krakbau S.A. are based on the NATM (New Austrian Tunnelling Method), which involves combining the anchoring of rock mass with shotcrete made with dry and wet methods. In the case of complex geological conditions (strong water saturation), we bored tunnels using the caisson method. Krakbau S.A. also specialises in refurbishment and retrofit of rail tunnels.
Tunnel Construction Tunnel Construction
KRAUSEPARKEN, Nordhavn, Denmark Client: METNORD JV
HOFOR, Copenhagen, Denmark Client: GAP ENTERPRISE ApS
BORING OF SHAFT, Blessberg, Germany Client: Ed. Züblin AG
TUNNELWORKS, Trimberg, Germany Client: Arge Hochtief Infrastructure GmbH, Ed. Züblin AG
CONSTRUCTION OF U3 SUBWAY LINE SECTION, Nuremberg, Germany Client: ARGE U-BAHN U3 B.1 NÜRNBERG (HOCHTIEF CONSTRUCTION AG I BK INFRASTRUKTUR GMBH) Scope of works: boring and concrete works
TUNEL ALBABSTIEG, Ulm, Germany Client: ARGE ED. ZÜBLIN AG- MAX BÖGL
TUNEL BAD CANNSTATT S-21, Stuttgart, Germany Client: ARGE HOCHTIEF INFRASTRUCTURE GMBH, BEMO TUNNELING GMBH I WAYSS UND FREYTAG INGENIEURBAU AG
BUSCHTUNNEL RAIL TUNNEL, Aachen, Germany Client: HOCHTIEF CONSTRUCTION AG. Scope of works: concrete works in a tunnel, portals, retaining walls outside the tunnel. Tunnel length: 711 m, tunnel cross-section: 70 m²
TUNEL EUERWANG, Nürnberg - Ingolstadt, Germany Client: ARGE TLM HOCHTIEF CONSTRUCTION AG, ALPINE BAU DEUTSCHLAND AG. Scope of works: boring and concrete works. Tunnel length: 7,700 m, tunnel cross-section at breakout: 149 m²
TUNEL IRLAHÜLL, Nürnberg – Ingolstadt, Germany Client: ARBEITSGEMEINSCHAFT TUNNEL LOS MITTE – HOCHTIEF CONSTRUCTION AG, ALPINE BAU DEUTSCHLAND GMBH. Scope of works: boring and concrete works. Rail tunnel with a length of 7,260 m, tunnel cross-section at breakout: 149 m². Tunnel radius: 8.80 m at breakout.
TUNEL KÖNIGSHAINER BERGE, Germany Client: ARGE TUNNEL KÖNIGSHAINER BERGE – HOCHTIEF AG, UNIVERSALE BAU GMBH. Scope of works: boring and concrete works. Road tunnel with a length of approx. 3,300 m. Total volume of concrete placed: >74,000 m³, average thickness of the inside concrete shell: 40 cm.
TUNEL KULCH, Bad Staffelsstein, Germany Client: ARGE TUNNEL LICHTENFELS (HOCHTIEF SOLUTIONS AG, ALPINE UNTERTAGEBAU GMBH, ALPINE BEMO TUNNELING GMBH, BICKHARDT BAU AG, STUTZ GMBH)
TUNEL RENNSTEIG, Germany Client: UNIVERSALE BAU GMBH. The longest road tunnel in Germany: 8,000 m. Tunnel cross-section at breakout: approx. 100 m². Scope of works: 3,000 m², volume of rock run: approx. 600,000 m³. Amount of shotcrete: approx. 36,000 m³.
TUNEL SCHLÜCHTERN, Schlüchtern, Germany Client: ARGE TUNNEL SCHLÜCHTERN (HOCHTIEF AG I ED. ZÜBLIN AG)
TUNEL SIEGKREISEL, Betzdorf, Germany Client: ARGE TUNNEL SIEGKREISEL (ALPINE BAU DEUTSCHLAND AG I H. KIRCHNER GMBH & CO. KG). Scope of works: boring and concrete works for a road tunnel along B62 national road. Tunnel length: 370 m, tunnel cross-section at breakout: 86 m² - 125 m².
TUNEL SIGAUER, Frankfurt – Cologne, Germany Client: UNIVERSALE-BAU GESELLSCHAFT GMBH. Rail tunnel with a length of approx. 400 m. 1 tunnel tube with a cross-section of approx. 140 m² at breakout. Total volume of rock run: approx. 56,000 m³. Due to large water inflows, we used the caisson method at a section of approx. 120 m.
TUNEL WALBERG – HOPFENBERG, Hessisch - Lichtenau, Germany Client: ARGE TUNNEL WALBERG – HOPFENBERG (ED. ZÜBLIN AG I ALPINE BAU DEUTSCHLAND AG). Scope of works: boring works. Road tunnel along A44 motorway from Kassel to Herleshausen. Tunnel length: Walberg tunnel: 280 m, Hopfenberg tunnel: 540 m.
AMAGERVÆRKET SHAFT AND HEATING TUNNEL, Copenhagen, Denmark Client: KFT-JV KOBENHAVNS FJERNVARME TUNNEL. Scope of works: shaft and tunnel boring.
TUNELE LINII METRA, Nordhavn, Denmark Client: METNORD JV
Lu - Vianden, Luxembourg Client: ARGE ERWEITERUNG PSW VIANDEN (ED. ZÜBLIN AG, STRABAG AG, JÄGER BAU GMBH)
Tunel Eva and Odenplan station, Sweden Client: BILFINGER BERGER CIVIL ODENPLAN AB
Tunel and station Triangeln, Sweden Client: MCG MALMÖ CITYTUNNEL GROUP HB
Tunel Vasa, Sweden Client: BILFINGER BERGER CIVIL ODENPLAN AB